Finding Builders in Thailand To Build Our Retirement House In Pakchong

Just A Quick Update On Our Thai House-Build Project. 5 October, 2010

Now Kanyah is back at Pakchong with the Thai House Plans (construction issue) and is looking again for builders to build our retirement house. But just as it was difficult to find a builder last year when we only had the house drawings that I made (not those produced by our Thai Architect which we have now), so this time it is not so easy also.

You maybe be wondering why we did not ask Kensington to build our home. I did ask in the beginning but unfortunately the location of our land is too far out for them to build. It is a shame as it is so difficult to find good reliable builders that do a professional job.

Kensington can build homes of all sizes, shapes and styles in many locations but Thailand is a big country and they cannot build everywhere.

It is always best to ask them and let them know your location as they can build in Chiang Mai, Phuket, Pattaya, Bangkok, Hua Hin, Ko Samui and many other areas. A lot depends on the project and the location.

However even if they cannot build your home I am sure one of their excellent architects can design it.

Anyway, Kanyah phoned me yesterday (I am still in the U.K., working) and gave me the following update.

Building Permit Application in Thailand

Kanyah has visited the Or Bor Tor office, which she says is close to our plot of building land in Pakchong and they have told here what documents are required to apply for the building permit. There are some documents she does not have at the moment and these are:-

A) The Signed Construction Drawings And Calculations

Although the construction drawings are finished and Kanyah has printed off a few sets we don’t have the sets signed off by the Thai Architect and the engineer together with the calculations. I have asked the Architect when she can receive them and he replied that since I had just issued some comments on the constrution drawings he would wait until any necessary changes had been made to the drawings and then issue the signed set. That may take a week or so.

B) The Thai House Registration Papers

Every Thai person should be registered at a house in Thailand and have their name entered on the house registration papers. The Thai house registration papers record the births, deaths, marriages and names of all people who are in residence at that address.

Kanyah’s name is registered at a friend’s house in Bangkok and she has asked her friend to send a copy to her in Pakchong. that should take a few days.

Once all these documents are received Kanyah will apply at the or Bor tor office for the Thai house Building Permit.

Finding Builders To Build Our Retirement House

As of today, Kanyah has given sets of the construction drawings to two builders in Pakchong. She is looking for more builders.

Small Builders And Labour Only Construction Contracts In Thailand

It seems, she says, that the local builders in Pakchong do not have the capital to make all the purchases of the materials when they build a house. (i.e. they can’t afford to buy the materials) Instead the Client (in this case us, or more accurately Kanyah) would have to purchase all materials.

This means that the build would be via a labour only contract. This has advantages and disadvantages.

The Advantages Of A Labour Only Construction Contract In Thailand

1. Lowest Material Costs

Assuming for a moment that the Client is a Thai national, like Kanyah, then by purchasing direct the Client can avoid mark-ups on prices put on by a builder if he does the procurement. Also Kanyah is good at negotiating when shopping and always manages to get a discount of some sort. So if we go the labour only route then we can be sure that we get the lowest materials costs.

2. Quality Control

By making the purchases directly, Kanyah is able to ensure that she gets the quality of materials that she wants. Unless every item in the build is specified beforehand a builder making the purchases would often be liable to locate the cheapest materials available, not necessarily of the right quality.

The Disadvantages Of A Labour Only Construction Contract In Thailand

1. No Idea Of Final Cost

If the builder is buying the materials he will include tha total cost when he submits his tender. We will know the final cost of the project before we start building.

If the cost is outside our budget we would be able make changes to the building and/or the quality of the finishes to reduce the cost.

If we are purchasing the materials ourselves, unless we spend weeks getting quotations for everything before we start, we will not know the final build cost until the house in fully constructed.

2. No Experience Of Procurement For Construction Material

Although Kanyah does know what concrete and re-bar is she does not have a detailed knowledge of building materials and the construction process both of which are needed by anyone undertaking the procurement of all the materials themselves.

3. Time, Effort And Management Systems

If Kanyah is procuring all the materials, she will have to spend all the time and effort necessary to do so. On a live construction project with a fixed construction programme this can be a stressful job, especially for a novice.

Also, strict management systems are needed to record all the purchase transaction, chase and check deliveries and control the costs. As a minimum computers skills and ability to use spreadsheets and understand Bills of Quantity. All this extra work on top of controlling the quality of the works is just too much extra effort for Kanyah and she does not have the necessary computer skills.

4. Responsibility For the Programme (Construction Schedule)

The purchase of the materials must be made in a timely fashion if the project is not put on hold awaiting for materials to arrive. If the project is halted awaiting material deliveries, then there will be extra costs of paying the builder for standing costs. By this I mean that the labour is not working but still has to be paid.

Turn-Key Building Contract

Having written all the above pros and cons of a labour only building contract it becomes clear to me that unless I go to Thailand to oversee the build then a labour only contract is nor suitable for us.

I need to explain all the above to Kanyah and then she needs to find a builder capable of making the materials purchases. In other words we need a turn-key building contract where all e do is pay the builder in stages for the completed work.

Bills Of Quantity (BOQ)

If you don’t know what a BOQ is then let me explain.

A Bills Of Quantity (BOQ) document is a list of all the different types of materials and components used in the construction of the building. Each item in the list is called a Line Item.

There are columns where for each Line Item in the BOQ the following information is entered:-

The Quantity. This may be m3 of concrete, square metres of roof tiles, or number of windows.

The Rate. This would be the cost that the builder would charge per unit of the materials. For example, X Baht/m3 for concrete Y Baht/m2 for roof tiles and Baht per window. It would include the cost of supplying and installing the item. (but see below)

The cost of each line item is then calculated by multiplying the rate by the quantity. The sum of all the costs gives the final cost of the project.

Sometimes the cost of installing or fixing the materials is shown separately from the supply only cost of the materials.

In this case there would be additional columns for labour cost per unit, total labour cost and final labour cost for each line item.

Obtaining A Bill Of Quantities (BOQ)

I want to get a BOQ made for our Pakchong house that Kanyah can give to the builders preparing quotations for us and I am in discussion with the Kensington Company to have that done. The person making the BOQs is called a Quantity Surveyor. (QS)

If I have a BOQ with quantities measured by the QS from the construction drawings and I issue to the builder without the quantities I can use my version to check what the builder is offering when he submits his completed BOQ.

It will take a couple of weeks to get the BOQ made by Kensington’s QS in Bangkok, so that will delay the obtaining of quotations from builders for a bit. Also I have to explain all this to Kanyah.

That’s all for this update, see you in the next post where hopefully I can report on some real progress on finding builders in Thailand.

Recommended
make Money in Thailand Logo
Post Categories
Keep Updated
Join the Announcement List and receive an email when something interesting is added to the blog or website.

 